START DATE
1st November 2013

PROJECT TITLE
Proposed Bridge Crossing Sungai Pulai and Link Road from Pelabuhan Tanjung Pelepas to Tanjung Bin, Mukim Air Masin and Sungai Karang,
Daerah Pontian and Mukim Pulai Daerah Johor Bahru.

FINISH DATE
30 November 2021

DESCRIPTION OF PROJECTS

  • 2-lane dual carriageway with approximate length of 7.5km
  • Construction of raised embankment and elevated deck structure on low lying soft ground
  • Four (4) bridges crossing:-
    • Sungai Boh
    • Sungai Pulai
    • Sungai Perepat
    • KTMB railway line to PTP
 Three (3) major junctions to be provided to tie into the existing roads and new developments.
  • To relocate / protect any existing services affected by the works
  • Provide street lighting along the roads and bridges.
  • Provide bridge soffit / pier lighting
  • Road Signage and Road Furniture.
CLIENT

SEAPORT WORLDWIDE SDN BHD 